Wellington Based Since 2017
Ward Demolition’s Wellington team uphold the same high standards of demolition as our Auckland crew. With an equally talented team of demolition specialist, that have vast experience in all aspects of demolition.
Only difference being they operate in higher wind conditions.
Our Wellington crew is smaller in numbers than our long-standing Auckland based team. However the team has increased rapidly since inception to between 20-30 full-time staff. With the full support of our Auckland team (approximately 80 full-time staff) we are able to tackle projects of any size and complexity. Operating with an extensive list of locally based equipment, Wellington also has the option of utilising our Heavy Haulage Transporters to source extra machinery from Auckland when required. Our Wellington based team have completed over 150 large projects and countless small ones across our near decade long presence in the region. Some of the more high profile jobs Include:
Wellington Hospital
RDL Hutt Road Project
Arlington Apartments (120 appartments)
Revera House (12 story cut and crane)
Paddington Apartments (asbestos removal and full demolition)
Below are some projects with full job profiles, click the photos to read more:
Wellington Central Library - 2022-2025
James Smith Carpark - 2024